Monk’s Home Improvements offers full service bathroom remodeling and tiling Madison and Chatham, New Jersey.

 

Click Here To Schedule Your Free Estimate Online Now

Or call us at 973-635-7900

 

We offer simple bathroom makeovers, which can take as little as 7 days, and we offer full bathroom renovations with new framing, plumbing and electrical work.  From your master bathroom to your powder room, we handle large and small bathroom renovations.

 

Recent Master Bathroom Renovation by Monk’s Home Improvements

Remodeled bathroom by Monk's Home Improvements

New floor tile, shower tile and door, new vanity, toilet and plumbing  fixtures.

 

New tile shower by Monk's Home Improvements
New tile shower by Monk’s Home Improvements

The average full bathroom remodel or “redoing a bathroom” requires 4 weeks from the day we start until the day the bathroom is finished and ready to use.  The first week is a very active week.  We handle all the demolition in one day, and then finish the rough electrical, plumbing and framing by the end of the first week.  The second week is spent entirely on inspections and doesn’t seem to move very fast.  After the inspections are over, we spend weeks three and four putting the bathroom back together again.  The dry wall goes first, then the tile and finally the trim and painting.  It takes seven to 14 days to handle the finish work in the new bathroom.

Not all bathroom contractors are willing to do smaller bathroom makeovers, but we find that makeovers are often appropriate in Madison and Chatham.  In a newer house, there is often no reason to gut the entire bathroom and replace all the plumbing and electrical.  We can often remove the tile from the floor and walls and replace it with new materials without having to remove the walls and floors.  In addition to the lower cost, these bathroom projects have the advantage of moving much faster.  We don’t need permits and inspections if we don’t remove the walls and floors so we can usually finish these bathrooms in about a week.  (painting included!)

It is very common for people to renovate several bathrooms in one project.  Having a bathroom remodeling company dedicated to a specific timeline is important in order to make sure your job doesn’t drag on for months past the deadline.

The tile, vanity and toilet have been removed for this bathroom makeover.

Bathroom makeover before
Bathroom makeover before

Our tile contractor installs new tile on the existing walls and floor.

 

New tile is installed on the existing walls.
New tile is installed on the existing walls.

New bathroom in 7 days!

Bathroom makeover complete!
Bathroom makeover complete!
New shower in bathroom makeover
New shower in bathroom makeover

 

We also handle all types of tile installations.  From your kitchen tile back splash, to your floors and tile showers, we have you covered!

Tile installer
Tile installer

New tile back splash, tile floor and counter tops!  Kitchen Makeover Complete!

 

Tile back splash, tile floor and new counter tops complete this kitchen makeover!
Tile back splash, tile floor and new counter tops complete this kitchen makeover!

 

If you are planning on remodeling or renovating your bathroom, or installing new tile, we would love the opportunity to tell you why we are the best bathroom contractors in Madison and Chatham!

 

 Madison New Jersey 07940     Chatham NJ 07928