Master Bath Remodel with Underfloor Heating

Oversized Marble Shower

 

Estimator: Greg Kihm

Project Manager: Angelo Santoro

Scope of work: Bathroom Remodel, Tile Installation

Location: Chatham NJ, 07928

Timeline: 10 days

 

While this 1980s master bath was fully functional, its age was evident in both style and wear.  Monk’s remodeled the space to create a larger shower area by removing a linen closet and soffit. A dual sink vanity was also part of the homeowner’s wish list.

Because this master bath was located above the garage, the floor was very cold in the winter months. A programmable heated floor mat was installed under the porcelain floor tile so the homeowner would always have warm feet, no matter what the temperature was outside.

Before                                                                                             After

IMG_0752
Master Bath Vanity Before
IMG_0800
Master Bath Vanity After

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Before                                                                              After

IMG_0753
Master Bath Shower Before
IMG_0807
Master Bath Shower After

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After removing the linen closet and soffit, the plumbing was relocated and the shower stall was framed. Additional insulation was placed between the back shower wall and the adjoining attic space. In addition to the underfloor heating, this extra insulation will help decrease temperature fluctuation.

IMG_0755
Framing the New Shower
IMG_0758
Prepping the Shower

 

 

 

 

 

 

 

 

 

 

 

After the programmable underfloor heat mat was laid, the new porcelain tile was installed on top. This tile has the look of stained wood with all the benefits of porcelain such as moisture resistance and easy cleaning.

Underfloor Heating and New Tile Floor Installed
Underfloor Heating and New Tile Floor Installed

 

 

IMG_0766
New Porcelain Tile with the Appearance of Wood

 

The walls were prepped to accommodate the new medicine cabinets and lighting. Then the new vanity was installed and leveled. New low-flow Toto toilet was also installed.

 

IMG_0775

 

The marble tile is in process of being installed. The tile installation was a bit tricky with the bump-out, so the bull-nosed edge pieces needed to be secured while they set.

 

Shower Tile In-Progress
Shower Tile In-Progress

 

The completed shower incorporated marble tile and marble shelving, accent tile and a built-in shampoo shelf.

 

Completed Shower
Completed Shower

 

This is a look at the vanity with double sinks and Grohe fixtures after being installed.

 

Vanity and Fixtures After
Vanity and Fixtures After

 

To see more bathroom remodeling projects by our team, be sure to check our our bathroom remodeling portfolio.

If you would like to see even more projects by us check out this custom built entertainment center, this wainscoting installation or this front porch renovation.

If you are considering a bathroom remodel in your home we would like the opportunity to tell you why we think we are the best bathroom remodeling contractor in Chatham, NJ  07928.

 

Get a FREE ESTIMATE

or Call 973-635-7900

Facebooktwittergoogle_plusredditpinterestlinkedintumblrmail