Calvary Presbyterian Church Steeple Renovation in Florham Park, NJ

Scope of work: Siding Replacement, Trim Replacement, Exterior Painting

Location: Florham Park, NJ 07932

Timeline: 3 days

 

It is true that our team at Monk’s mostly takes care of residential work, but that isn’t always the case.  Did you know that our team recently rebuilt a Florham Park, NJ church steeple?  We had repainted the Calvary Presbyterian Church steeple several times. Due to its unprotected location, exposure to the elements had caused for repainting the steeple to become a routine practice.  However, the church decided that they wanted a better solution, some sort of improvement that would require the steeple to look great without so much maintenance.  As expected our team at Monk’s was able to deliver a solution.  In only three days our team replaced all of the steeple’s siding and trim with more weather resilient materials.

 

Before

Church Steeple Renovation by Monk's
Calvary Presbyterian Church Steeple Renovation by Monk’s

 

After

Completed Church Steeple Renovation by Monk's
Completed Church Steeple Renovation by Monk’s

 

We performed a routine siding replacement job, only this time it was done over sixty feet in the air!  Building codes require a proper lift to be used whenever construction is done over sixty feet in the air.  We rented a lift for the day to renovate this Florham Park church steeple.

 

Church Steeple Renovation by Monk's- Florham Park, NJ
Church Steeple Renovation in Florham Park, NJ

 

 

Church Steeple Renovation

 

When we arrived, we began by stripping all original cedar siding and pine trim off of the steeple.  While these are excellent materials to use for other projects, this church needed something sturdier.  Due to the steeple’s location it is exposed to all sorts of weather and rather hard to get to for routine repainting.  By replacing the siding and trim with a hardier material the steeple would not need as much maintenance.

 

Church Steeple Renovation by Monk's
Church Steeple Renovation by Monk’s

 

Our team decided to replace the original cedar siding with hardi plank, and the original pine trim with azek.  Both of these materials are resilient against the elements.  The hardi plank and azek trim were prefinished, so we could install them and without painting.

 

Siding Replacement by Monk's- Florham Park, NJ
Siding Replacement by Monk’s- Florham Park, NJ

 

Our team also created custom built on louver panels for ventilation in the steeple.  We built these louver panels on the ground and then installed via the lift.

 

Completed Church Steeple Renovation by Monk's
Completed Church Steeple Renovation by Monk’s

 

Besides the work on the steeple, our team also painted a portion of the church’s lower section, including the front columns.  The process here was typical to all of the great exterior paint jobs our team performs. We carefully cleaned and sanded the area, then applied a coat of primer followed by two coats of paint.

 

Exterior Painting by Monk's
Exterior Painting by Monk’s

 

In only three days our team had given the Calvary Presbyterian Church in Florham Park a serious face lift!

 

Completed Church Steeple Renovation with Exterior Painting by Monk's
Completed Church Steeple Renovation with Exterior Painting by Monk’s

 

 

If you are considering siding replacement or an exterior painting project we would like the opportunity to tell you why we think we are the best carpentry and exterior painting contractor in Florham Park, NJ 07932.  

 

Call 973-333-4719

Facebooktwittergoogle_plusredditpinterestlinkedintumblrmail